SYSTEM SELECTION
Unitized vs. Stick Curtain Wall
The choice between unitized and stick curtain wall systems should respond to the specific requirements of each project. Building height and geometry, facade repetition, programme, site logistics, access, installation sequence, performance requirements and supply-chain strategy all influence the appropriate solution.
Early system selection can have a significant impact on design development, procurement strategy, testing requirements and construction programme.
DESIGN & CONSTRUCTION
Designing Facades for Buildability
A successful facade must perform technically while remaining practical to manufacture, transport and install. Decisions made during early design development influence tolerances, interfaces, panelisation, access, sequencing and installation methodology.
Integrating construction knowledge into the engineering process helps identify potential site and fabrication challenges before they become costly problems.
PERFORMANCE
Managing Critical Facade Interfaces
Many facade performance issues occur not within the primary system itself, but at interfaces with structure, roofs, terraces, waterproofing, entrances and adjacent building-envelope elements.
Clear interface definition, coordinated detailing and responsibility allocation are essential to achieving reliable weather, thermal and movement performance.
PROJECT DELIVERY
Connecting Engineering with Construction
Facade engineering and facade construction should not be treated as isolated activities. Engineering decisions influence procurement, fabrication, logistics and installation, while construction constraints frequently require informed technical responses.
An integrated approach helps maintain architectural intent while improving buildability, coordination and delivery throughout the project lifecycle.